Confidental Hyperscale Datacenter, Finland

LBB Group provided a team of electricians, cable pullers, and site engineers to install cables and make terminations for the generator yard cabling.

Details
  • The assignment duration was 6 months.
  • There were zero accidents.
  • 42,000 meters of cable were installed.
  • 2,100 terminations were completed.
  • Manpower peaked at a maximum of 16 people.